OS
Home/Platform

DOUBLENING OS

Hardware is the easy part to demonstrate. The platform is where an installation either becomes a system the plant keeps using or turns into a dashboard nobody opens after month three. Everything here is built around one idea: a single tag model that a 1998 controller and a 2024 breaker can both live inside.

06 modules Hosted · on-premise · hybrid 99.9% uptime, trailing 12 months
Asset tree
▾ Toledo — Plant 2
  ▾ Panel DP-14
    · L1 Extruder 63 A
    · L2 Extruder 63 A
    · L3 Chiller 32 A
  ▾ Panel LP-03
    · Aisle lighting
  ▾ Gate 4
    · Camera 04 · AI
  ▾ Cold room 2
    · Temp probe

2 gateways · 41 devices
last poll 00:00:02 ago
Plant 2 — last 24 h
41.2MWh today
1.84MW peak
0.94Power factor
criticalCold room 2 above setpoint for 6 min02:14
warningDP-14 phase imbalance 11%01:47
infoAisle lighting held at 40% — daylight23:58
infoPeak shed 0.4 MW, 22 min, no line impact22:30
Illustrative interface. Live data shown on a call, not in a screenshot.
Modules

Six modules, sold together or separately.

Request a demo
Deployment

Where the data sits is a decision, not a default.

OPTION 01

Hosted

We run it. You log in.

Multi-tenant, US-hosted, per-site subscription. Fastest to start and the cheapest at one site, and the option most plants choose for energy and lighting where there is no sensitive video involved.

  • Included updates
  • Per-site or per-tag pricing
  • No server on site
OPTION 02

On-premise

Your hardware, your network.

A rack server in the plant or the customer's own VM. Required where video must not leave the building, or where the corporate IT policy simply forbids an outbound connection from the OT network.

  • No internet dependency
  • Video stays on site
  • Annual licence, air-gap capable
OPTION 03

Hybrid

Edge for video, cloud for the rest.

Video analytics run at the edge and only event metadata is published; energy and alarm data go to the hosted platform. This is the common answer once a security review has been through the proposal.

  • Video never leaves site
  • Estate-level reporting in cloud
  • Per-site or estate-wide
SECURITY

Controls

What a security questionnaire asks.

Role-based access, per-site tenancy, MQTT over TLS 1.2, signed firmware, full audit log of every control action, and a documented data-retention period per customer.

  • TLS 1.2 · signed firmware
  • RBAC · audit log
  • Configurable retention
Integration

It feeds what you already run. It does not replace it.

SOUTHBOUND

Into the plant

Modbus RTU and TCP as master, BACnet/IP, DL/T 645 and ONVIF ingest. The gateway polls; nothing new needs to be installed on a controller that has been running since 1998.

NORTHBOUND

Out to SCADA and ERP

OPC UA server, MQTT topics per tag, and a REST API with the same authentication as the UI. Existing SCADA keeps its own screens and simply reads one more server.

NO LOCK-IN

If we disappear tomorrow

Tag definitions export to CSV and JSON, historical data exports in bulk, and every device still speaks its native protocol without our gateway in the path. That is stated in the contract, not just here.

99.9%Uptime, trailing 12 months
8,600Points managed
5,000/sTag updates per gateway
30 dStore-and-forward buffer